In
addition to various A/E consultants and contractors, supervised a team of 20
members of in-house staff comprising Construction Managers, Project
Engineers, Cost and Scheduling Engineers and Restaurant Maintenance staff.
AUG
1994 – AUG 1996 – DIGITAL AUTOMATION, KARACHI
PROJECT CONTROLS CONSULTANT
Provided
Computer based CPM project planning, scheduling, monitoring and updating
services to Engineering Consultants and Construction Contractors on numerous
projects including commercial buildings, road, bridges, flyovers and
industrial complexes. Software used Primavera (P3), Suretrak, Timeline and
Microsoft Project. Conducted courses on Computer Based Project Planning.
Supervised and managed CAD conversion, 3D graphics and animation projects.
Software used AutoCAD and 3D Studios. Organized courses on AutoCAD and 3D
Studios.
AUG
1991 – AUG 1994 – CHINIOT GENERAL HOSPITAL, KARACHI
SR. PROJECT COORDINATOR/PROJECT COORDINATOR
On
300 beds General Hospital project performed CPM planning/scheduling, Contract
Administration/Contract Management, Coordination and Quality Assurance
activities. Ensured architectural and engineering design adherence to project
objectives. Also Monitored construction progress and verified Contractors’
payments.
MAR
1990 – JAN 1991 – MOHAMED SALAHUDDIN CONSULTING ENGINNERING BUREAU, BAHRAIN
PROJECT MANAGER/PROJECT ENGINEER
Performed
Construction Quality Assurance, Progress Monitoring and Bid Evaluation at
various projects including royal family conference centers, resorts and
villas.
NOV
1988 – NOV 1989 – NATIONAL ENG. SERVICES PAKISTAN (NESPAK), KARACHI
PROJECT MANAGER/SENIOR ENGINEER
Prepared
CPM schedules using Pert Master Advance Planning software for activities
related to pre-construction phase. Supervised development process of designing
and contract management from client concept through detailed drawings,
estimates, bid and award. Performed coordination and project control
activities for various projects including Industrial Commercial and
Residential projects.
FEB
1986 – NOV 1988 – RESOURCES & ENGINEERING CORP. (PVT) LTD., KARACHI
SENIOR ENGINEER/JUNIOR ENGINEER
Prepared
CPM construction schedules utilizing Planning software such as Pert Master
and Harvard Total Project Manager. Performed coordination and project control
activities. Prepared reports. Assisted in Contract Document Compilation and
Contract Administration. Initially Junior Engineer observing construction
quality on high-rise commercial complexes
1985
– ABT ENGINEERS, INC. OKLAHOMA CITY, OKLAHOMA
CIVIL ENGINEER
Investigated
problems and suggested remedies for the water distribution system network of
the City of Holdenville, Oklahoma.
1982-1983
– NM CONSTRUCTION COMPANY, KARACHI
SITE ENGINEER
Supervised
construction of Telephone Exchange Building, ancillary structures and laying
of water mains at Export Processing Zone, Karachi (US $1M).
PROFESSIONAL
AFFILIATIONS / CERTIFICATIONS
·
Project Management Institute, USA (Certified PMP)
·
USGBC – (LEED AP)
REFERENCES
Available
upon request
WILLING TO RELOCATE
DETAILS OF EXPERIENCE AND PROFICIENCIES
Primavera Enterprise (P6):
Proficiencies
include:
·
Creating Schedule &
Resource calendars
·
Creating WBS
·
Creating OBS
(Organizational Breakdown Structure)
·
Creating RBS (Resource
Breakdown Structure)
·
Creating and maintaining
EPS structure for Program and Portfolio Management
·
Baseline Schedule
Development
·
Creating Project Codes
·
Creating Activity Codes
·
Creating User Defined
Fields
·
Performing Global Changes
·
Import/Export data from
other software
·
Creating / Assigning
Resources & Costs
·
Creating Resource &
Cashflows Forecasts
·
Performing What-if
Scenarios
·
Using Delphi Method for
identifying Risk
·
Performing Risk Analysis
using P6 and Primavera Risk or other software/techniques such as Stochastic
Method
·
Forecasting chances of
Project completing on a given date and within a given Cost
·
Creating Thresholds to
generate Risks
·
Qualifying &
Quantifying Risks
·
Schedule Updating
·
Earned Value Analysis using
SPI and CPI
·
Calculation of TCPI
·
Trend Analysis
·
Calculation of ET to
calculate more accurate SPI once project is over 50% complete
·
Calculation of ETC and EAC
·
Contractor submitted
Baseline Schedule Analysis
·
Contractor submitted Update
Analysis using Claim Digger software as well as other techniques
·
Forensic Analysis of
schedule for analyzing contractor’s claims
·
As Built Schedule for
future reference
Some of the
projects (with approximate costs) include:
·
Abbott Elizabeth Schools
Program ($200 Million)
·
Abbott Schools Program,
Region 9 ($250 Million)
·
Renovation Program for
Philadelphia Schools
·
Westfield Shopping Mall
Construction including Additions/Renovations across US East Coast:
-
Garden State Plaza – Mall
Expansion and Parking Deck-B Replacement ($65 Million)
-
World Trade Center,
Westfield Retail Development ($300 Million)
-
Sunrise Shopping Mall, Long
Island, NY Expansion/Renovation ($20 Million)
-
South Shore Shopping Mall,
Long Island, NY Expansion/Renovation ($15 Million)
-
Westfield Trumbull,
Connecticut, Mall Expansion/Renovation ($250 Million)
-
Other Westfield Shopping
Centers in the States of Maryland and Florida
Primavera P3:
Proficiencies
include:
·
Creating Schedule &
Resource calendars
·
Baseline Schedule
Development
·
Creating WBS
·
Creating/Assigning Activity
Codes
·
Creating/Assigning Custom
data Items
·
Performing Global Changes
·
Import/Export data from
other software
·
Creating / Assigning
Resources & Costs
·
Resource Leveling
·
Creating Resource &
Cashflows Forecasts
·
Performing What-if
Scenarios
·
Performing Risk Analysis
using Primavera Montecarlo
·
Creating and maintaining
Project/Subproject structure for multi-project environment
·
Schedule Updating
·
Performing Earned Value
Analysis
·
Contractor submitted
Baseline Schedule Analysis
·
Contractor submitted Update
Analysis using Claim Digger software
·
Forensic Analysis of
schedule for analyzing contractor’s claims
·
As Built Schedule
Some of the
projects (with approximate costs) include:
·
GlaxoSmithKline (GSK)
Automation Facility ($55 Million)
·
Aviron Production Line #2,
Philadelphia, PA ($18 Million)
·
Wyeth Ayerst Building,
Pearl River, NY ($80 Million)
·
Wyeth Ayerst PNU-Immune
Facility Upgrade ($15 Million)
·
Council Rock High School
($60 Million)
·
Abbott School Program A
($100 Million)
·
North Plainfield Middle
& Elementary School Addition & Renovation ($20 Million)
·
Barnegat Schools
(3-schools) ($60 Million)
·
Several Correction Centers
& Psychiatric Centers for NYOGS (Approximate Range $2 to $15 Million)
· Numerous Proposal Stage Schedules
Primavera Suretrak / Microsoft Project:
Proficiencies
include:
·
Creating Schedule &
Resource calendars
·
Baseline Schedule
Development
·
Creating WBS
·
Creating/Assigning Activity
Codes
·
Creating/Assigning Custom
data Items (Suretrak only)
·
Performing Global Changes
(Suretrak only)
·
Import/Export data from
other software
·
Creating / Assigning
Resources & Costs
·
Resource Leveling
·
Creating Resource &
Cashflows Forecasts
·
Performing What-if
Scenarios
·
Creating and maintaining
Project/Subproject structure for multi-project environment
·
Schedule Updating
·
As Built Schedules for
future reference
Some of the
projects (with approximate costs) include:
· Schedules for Commissioning &
Validation of various pharmaceutical projects
·
Beautification of
Quaid-e-Azam Mausoleum, Karachi-Pakistan (Approx Equivalent; $5 Million)
·
Allied Bank Limited, Main
Clifton Raod, Karachi-Pakistan (Approx Equivalent; $2 Million)
·
Construction of Retail
Building at Zamzama, Karachi-Pakistan (Approx Equivalent; $1 Million)
·
Flyover at University Road
& Rashid Minhas Road Junction, Karachi-Pakistan (Approx Equivalent; $15
Million)
·
Bridge over Railway Track
on University Road, Karachi-Pakistan (Approx Equivalent; $8 Million)
·
Duplication of Bridge over
Liyari River at Rashid Minhas Road, Karachi-Pakistan (Approx Equivalent; $2
Million)
·
Duplication of Bridge over
Liyari River at Mauripur Road, Karachi-Pakistan (Approx Equivalent; $2
Million)
·
Duplication of Bridge over
Railway Tracks at Main Korangi Road, Karachi-Pakistan (Approx Equivalent; $2
Million)
·
Golf Course at Bin-Qasim,
Karachi-Pakistan (Approx Equivalent; $5 Million)
Schedule Analysis & Claims Avoidance:
Proficiencies
include:
·
Contractor submitted
Baseline Schedule Analysis
·
Contractor submitted Update
Analysis using Claim Digger software as well as other techniques
·
Analysis of schedule for
detecting potential for future contractor’s claims
·
Making sure that Contractor
had not made any un-authorized changes in the schedule logic durations etc.
·
Use of Custom Data Items to
find out the cause of changes in the critical path
·
Determining if there were
any concurrent delays taking place if contractor submits a claim for Time
Extension, Cost Reimbursement or both.
·
Determining if the
Contractor was responsible for a delay in scheduled work. Also determining
whether or not the delay in question was excusable or non-excusable and based
on the findings suggesting whether or not the Contractor should be
compensated as, for example, may be the case if the delay occurred due to
non-availability of timely approval on the part of the client or the
non-availability of a detail/clarification, which, the contractor had
requested in timely fashion from the Architect provided the above delays
caused the project critical path to slip and provided that there were no
concurrent critical delays were taking place due to own slackness of the
contractor.
Also, if
the Contractor claimed that the work was delayed due to the Act of God, for
example, extremely inclement weather conditions, then, determining if the
type and intensity of such weather was not expected during the part of the
year at the concerned geographical location.
·
Forensic Analysis of the
successive schedule updates including comparison with Baseline, in case, the
Contractor had submitted the claim for a Delay Event after several updates.
·
Writing Analysis Reports
and keeping paper as well as electronic records for future reference.
Some of the
projects (with approximate costs) include:
·
Abbott Elizabeth Schools
Program ($200 Million)
·
Abbott Schools Program,
Region 9 ($250 Million)
·
North Plainfield Middle
& Elementary School Addition & Renovation ($20 Million)
·
Barnegat Schools
(3-schools) ($60 Million)
·
Council Rock High School
($60 Million)
Risk Analysis & Management:
Proficiencies
include:
· Risk Identification Techniques
-
Delphi Method
-
Brain Storming
-
Creating Risk Register
· Risk Analysis
-
Quantification &
Qualification of Risks
-
Updating Risk Register
-
Use of Primavera Montecarlo
(P3)
-
Use of Stochastic Method
-
Use of PERT Analysis
-
Use of Primavera Risk
Analysis (P6)
-
Forecasting chances of
Project completing on a given date and within a given Cost
-
Creating Thresholds to
generate Risks if a certain threshold is surpassed
· Risk Response Planning:
-
Acceptance
-
Avoidance
-
Transference
-
Work Around
· Risk Management
-
Manage Risk as per risk
response plan
-
Repeat Risk Analysis steps
if the situation changes
-
Revise Risk Response Plan
-
Update Risk Register
-
Record outcomes
· Updating Risk Register for future
projects use
Earned Value Management:
Proficiencies
include:
·
Schedule Updating
·
Earned Value Analysis using
SPI and CPI
·
Calculation of TCPI
·
Trend Analysis
·
Calculation of ET to
calculate more accurate SPI once project is over 50% complete
·
Calculation of ETC and EAC
·
Creating Custom Reports and
Graphics
Report Writing & Presentations:
Proficiencies
include:
·
Creating Custom Layouts for
Baseline Schedules, Progress Updates & Comparisons with Baselines,
·
Creating Graphic
Presentations including Gantt Charts, Network Diagram, Resource Profiles,
Cashflow Forecasts, Resource Usage Forecasts, Multiple Projects Comparative
Status’, EVM-Curves, Probabilistic Forecast Graphs, Presentation Poster size
schedule plots (e.g. 30”x40” etc.)
·
Reporting Earned Value
Status
·
Creating Two-week (or
X-weeks) Look-Ahead
·
Creating Layouts showing
1-Line, 1-Page or Detailed Schedule, drawing data from the same database
·
Standard Reports as
available with software
·
Executive Summaries &
Detailed Write-ups